Search

    Cases

    Serbian fruit exporter chooses dry ice granule machine for fruit export

    Serbian fruit exporter purchased a dry ice granule machine with 40–50 kg/h capacity and 110L dry ice boxes for temperature-controlled fruit export transportation.

    Serbian fruit exporter chooses dry ice granule machine for fruit export

    A fruit exporter in Serbia purchased a dry ice granule machine and 110L dry ice boxes to support the temperature-controlled transportation of exported fruit. The solution allows the customer to produce dry ice pellets and use them with insulated boxes during shipping.

    dry ice pellet machine
    dry ice pellet machine

    Customer requirement and solution

    The Serbian customer needed a practical dry ice solution for fruit export. Based on the required capacity and pellet size, we recommended a dry ice granule machine with a capacity of 40–50 kg/h, together with 110L dry ice boxes.

    The machine produces Φ3–Φ16 mm dry ice pellets, suitable for different packaging and transportation requirements.

    Dry ice making machine parameters

    ParameterSpecification
    Capacity40–50 kg/h
    Dry Ice SizeΦ3–Φ16 mm
    Dry Ice Density1550 kg/m³
    CO₂ Conversion Ratio≥42%
    Power3 kW
    Weight195 kg
    Dimensions100 × 50 × 100 cm
    parameters of dry ice granule machine

    The supporting dry ice box has a volume of 110 L, providing insulated storage and transportation space for the customer’s fruit export operations.

    Production and shipment

    After confirming the dry ice pellet machine specifications and dry ice box requirements, we arranged production and inspection. The completed equipment was properly packed and shipped to Serbia.

    Summary of export case studies

    The final solution combines dry ice production and insulated storage, providing a convenient setup for preparing and handling dry ice before fruit transportation.

    If you are also looking for a d ry ice granule machine for food export, we can recommend a suitable configuration based on your production capacity and transportation requirements.

    Blog